JF015E X181830BB
JF015E Master cylinder piston repair kit is a transmission part for Nissan. It is made in the original factory and has excellent quality. Rich varieties, sufficient stock, support customization.
1.JF015E Master cylinder piston repair kit is Brand new original manufacturing. Remanufaturing is also avaliable.
2.Prices are negotiatable depend on quantity.
3.It is available for Nissan.
4.OEM NO:X181830BB.
5.Customization is supportable.
Model No | JF015E Main pressure cylinder repair kit with piston |
Material | Steel |
OEM No | X181830BB |
Condition | Brand new original factory |
Transport Package | Carton Packaging |
Origin | China |
Applicable Car | Nissan |
Production Capacity | 2000 pcs/year |
Product Name | JF015EX181830BB Main pressure cylinder repair kit with piston |
MOQ | 1 PCS |
Loading Port | Ningbo/Shanghai |
Q1. How long is our production lead time?
A1: Within 7 days upon receive deposit(for the products in stock).
Q2. What is the payment term?
A2: T/T or L/C at sight. 30% Deposit for start the production ,the balance before the shipment when goods are ready.
Q3. What is the packing details?
A3: Packing with the carton boxes.
JF015E Master cylinder piston repair kit is a transmission part for Nissan. It is made in the original factory and has excellent quality. Rich varieties, sufficient stock, support customization.
1.JF015E Master cylinder piston repair kit is Brand new original manufacturing. Remanufaturing is also avaliable.
2.Prices are negotiatable depend on quantity.
3.It is available for Nissan.
4.OEM NO:X181830BB.
5.Customization is supportable.
Model No | JF015E Main pressure cylinder repair kit with piston |
Material | Steel |
OEM No | X181830BB |
Condition | Brand new original factory |
Transport Package | Carton Packaging |
Origin | China |
Applicable Car | Nissan |
Production Capacity | 2000 pcs/year |
Product Name | JF015EX181830BB Main pressure cylinder repair kit with piston |
MOQ | 1 PCS |
Loading Port | Ningbo/Shanghai |
Q1. How long is our production lead time?
A1: Within 7 days upon receive deposit(for the products in stock).
Q2. What is the payment term?
A2: T/T or L/C at sight. 30% Deposit for start the production ,the balance before the shipment when goods are ready.
Q3. What is the packing details?
A3: Packing with the carton boxes.